Gunnebo Speedstile Fl Installation Manual -
Gunnebo SpeedStile FL: Essential Installation & Setup Guide The Gunnebo SpeedStile FL (Flap Leaf) is a sophisticated speed gate designed to balance security with a high-flow pedestrian aesthetic. This guide synthesizes key technical requirements and procedural steps for professional installation, ensuring operational longevity and safety. 1. Site Preparation & Structural Requirements
Step 2 – Slide in the motor unit
- It goes into the driven pedestal (usually the right lane).
- Connect the motor cable to the controller. If it doesn’t click, don’t force it. Wrong orientation is a common prayer at 3 AM.
Quarterly:
The installation typically involves securing the cabinets using anchor bolts, requiring a minimum bolting depth of 70mm into concrete. Installation Procedure Gunnebo SpeedStile FLS Installation Guide gunnebo speedstile fl installation manual
- Clean the top cover and IR sensor array with isopropyl alcohol.
- Test the fire alarm override input (flaps must open immediately and stay open).
Conduits: Any horizontal conduits running below the SpeedStile must be at least 140mm below the Finished Floor Level (FFL). 2. Technical Specifications SpeedStile FL Gunnebo SpeedStile FL: Essential Installation & Setup Guide
- Confirm mains at distribution board, check in-unit fuses and isolation switch, verify earth continuity.