Galaxy Aqua Premier Installation Manual

Galaxy Aqua Premier Installation Manual

Galaxy Aqua Premier is an instantaneous electric water heater (typically 9.5kW) designed for unvented, direct mains supply to one or two outlets, such as kitchen sinks or bathroom basins. The Shower Doctor Installation Prerequisites Water Supply: Connect only to a 15mm cold water mains supply. Minimum Running Pressure:

Usability

  1. A dedicated 110V power outlet nearby.
  2. A cold water supply line with a shut-off valve.
  3. A drain line for wastewater discharge.
  4. Adequate space for the system components.

Isolate Supplies: Turn off the electrical supply at the consumer unit and shut off the water mains. galaxy aqua premier installation manual

  1. Positioning: Place the pump on a solid, flat surface. In a pond, elevate the pump 6–8 inches off the bottom to prevent sludge intake.
  2. Plumbing Connections: Attach the adapter to the pump outlet. Use PTFE tape or silicone grease on threads—never PVC primer/glue directly on the pump housing.
  3. Priming & Startup: For submersible use: Submerge, then plug in. For dry use: Fill the pump housing with water via the priming port before turning on the power.